top of page

Recently Completed Projects

"Lake La Quinta HOA" - La Quinta, CA (Micro Grinding / Hot Crack Fill / Hot Mastic Patching) 480,000 SF  

Micro Grinding

Micro Grinding

Micro Grinding

Micro Grinding

Hot Crack Fill

Hot Crack Fill

Hot Crack Fill

Hot Crack Fill

Mastic Skip Patching Before

Mastic Skip Patching Before

Mastic Skin Patching After

Mastic Skin Patching After

Mastic Low Spot Before

Mastic Low Spot Before

Mastic Low Spot After

Mastic Low Spot After

Applying Mastic

Applying Mastic

"Lake La Quinta HOA" - La Quinta, CA (RAP Type 2 Slurry Seal w/ Pneumatic Rolling) 480,000 SF  

Pneumatic Rolled RAP Type 2 Slurry

Pneumatic Rolled RAP Type 2 Slurry

Pneumatic Rolled RAP Type 2 Slurry

Pneumatic Rolled RAP Type 2 Slurry

Pneumatic Rolled RAP Type 2 Slurry

Pneumatic Rolled RAP Type 2 Slurry

Pneumatic Rolled RAP Type 2 Slurry

Pneumatic Rolled RAP Type 2 Slurry

Pneumatic Rolled RAP Type 2 Slurry

Pneumatic Rolled RAP Type 2 Slurry

"Water District Bristol Street Improvements" - Santa Ana, CA (Type 1 & 2 Slurry Sealing) 120,000 SF

Before
During
Before
During
During
After

"Western Hills Country Club" - Chino Hills, CA (Type 1 & 2 Slurry Coat with Slurry Patching) 55,000 SF 

Before_SlurryPatches

Before_SlurryPatches

Mid_Slurry

Mid_Slurry

Finished_Slurry

Finished_Slurry

Cart Path @ "Western Hills Country Club" - Chino Hills, CA (2-Type 2 Slurry Coats with Slurry Patching) 

Before

Before

After

After

Before

Before

After

After

Before

Before

After

After

"Desert Oasis MHP" - Rosamond, CA (Type 2 Slurry Seal) 420,000 SF 

Prior

Prior

Prior

Prior

Prior

Prior

After

After

After

After

After

After

"The Retreat HOA" - Corona, CA (Type 2 Slurry Coat) 1.2 Million Square Feet

Existing

Existing

Pass 1

Pass 1

Pass 2

Pass 2

Final Pass

Final Pass

"Utility Patch Work Cover Ups" - Newport Beach, CA (Type 1 Slurry Coat) - 20,000 SF 

Existing Patched Street

Existing Patched Street

First Pass Complete

First Pass Complete

Beginning of Final Pass

Beginning of Final Pass

Pulling Final Pass

Pulling Final Pass

Finished Cover Up

Finished Cover Up

"Willow Street Church of God" - Long Beach, CA (Type 1 Slurry Coat) 25,000 Square Feet

Before

Before

During

During

After

After

"Residential Driveway" - Corona, CA (Type 2 Slurry Coat) - 2,500 Square Feet

Before

Before

During

During

After

After

bottom of page